We follow the following steps to build a project.

1) Planning & Requirement Analysis

To define the costs and benefits of the project, select a project team, and set out the detailed stages.

2) Defining Requirements

It consists of all the product requirements to be designed and developed during the project life cycle.

3) Designing the Product Architecture

It defines the wireframes and working flow of the project.

4) Developing the Product

The implementation of design begins concerning writing code.

5) Testing the Product

During this stage, unit testing, integration testing, system testing, acceptance testing are done.

6) Product Deployment

Once the software is certified, and no bugs or errors are stated, then it is deployed.